PITZ Laser Beam Line Control |
Apart from the Beam status file which is discussed elsewhere, the LBL server in the course of operation produces two more output files :
It is recommended to clean the directories from time to time. Example 1: StatusHistory_01_12_2003.dat Actual Time | MIRROR.M3.HOR | MIRROR.M3.VER | MIRROR.M4.HOR | MIRROR.M4.VER | MIRROR.M5.HOR | MIRROR.M5.VER | UTC 01.12.2003,21:33:11 | 295.956 95844 | 372.958 120781 | 217.363 97223 | 227.361 101695 | 208.002 92606 | 248.097 110457 | UTC 01.12.2003,21:33:27 | 295.956 95844 | 372.958 120781 | 217.363 97223 | 227.361 101695 | 208.002 92606 | 247.996 110412 | UTC 01.12.2003,21:33:45 | 295.956 95844 | 372.958 120781 | 217.363 97223 | 227.361 101695 | 208.103 92651 | 247.996 110412 | UTC 01.12.2003,21:34:11 | 295.956 95844 | 372.958 120781 | 217.363 97223 | 227.361 101695 | 208.002 92606 | 247.996 110412 | UTC 01.12.2003,21:44:39 | 295.956 95844 | 372.958 120781 | 217.363 97223 | 227.361 101695 | 208.002 92606 | 248.097 110457 | UTC 01.12.2003,21:45:45 | 295.956 95844 | 372.958 120781 | 217.363 97223 | 227.361 101695 | 208.002 92606 | 247.996 110412 | Example 2: ErrorMess_01_12_2003.dat UTC 01.12.2003,21:45:08 WARNING: 102.MAX 163840 steps/8000.00 mkm/368.00 mmOnNext, Axis MIRROR.M5.VER UTC 01.12.2003,21:58:43 FATAL: 225.DB! beamStatus L6:AxisName not found Back to Index |
Last update by R. Leiste on 16.12.2003 (leiste@ifh.de) |