Why upgrade the detector ?

Operate at Main Injector = Run II

Add solenoid

Add Si detector

Add preshower detectors

Replace tracking system

Upgrade/Improve muon system

Upgrade DAQ/trigger

Main Injector,Tevatron on schedule

Accelerator ready for D0 roll in October 1999