SP2: new scheduler
SP2: new scheduler
History:
- Since 1994 - LoadLeveler in combination with LSF first on 8 and afterwards on 16 nodes
- LL was used for parallel jobs, and LSF - for serial
- the two operated in different time slots; long serial jobs were suspended and paged out regularly to open the way for parallel jobs